Fallon Sports Park Baseball Field G Upgrades

PROJECT SCOPE: This project provides for the design-build of an aluminum 60-foot flagpole at the southwest corner of the baseball diamond behind the First Base side bullpen. The Contractor shall have a licensed California structural engineer verify the wind and flag loading on the aluminum flagpole and design the flagpole foundation. Provide the 60-foot Aluminum flagpole and accessories. Provide a 10-foot x 15-foot United States Flag and a same size California State Flag. Excavate flagpole foundation, dispose of spoils, place concrete foundation and rebar, assemble flagpole, place City provided solar beacon light to top of pole, and erect the Flagpole. All work must be completed by April 30, 2025.
Specifications (click to expand/collapse)