Safe Routes to School Improvements
Status
Bidding Closed
Prebid Date | 5/2/24 10:00am |
Bid Date | 5/16/24 2:30pm |
Location
Dublin, CA
PROJECT SCOPE: The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: modification to existing pedestrian curb ramps, modifications to curb radiuses, minor civil improvements, installation of foundations, signal poles, posts, pull boxes, wiring, push buttons, and other items of work which are required for installation of Rectangular Rapid Flashing Beacons (RRFBs) at three locations on Grafton Street and Antone Way, Central Parkway and Aspen Street, and Amador Valley Boulevard and Burton Street, and modifications to existing traffic signal at Central Parkway and Hibernia Drive, consisting of installing new traffic signal poles and foundation, traffic signal equipment, pull boxes, traffic signal conduit, conductors and cables, street lighting, installing sidewalk, curb and gutter, ADA curb ramps, and reconstruction drainage inlet, as shown on the plans, described in these Special Provisions and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.
The City’s estimated total construction cost for this Project is between $1,500,000 - $1,650,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range.