Irrigation System Upgrades Project
Status
Accepting Bids
Prebid Date | 4/15/25 2:00pm |
Bid Date | 5/6/25 2:00pm |
Location
Dublin, CA
COST ESTIMATE: The City’s estimated total construction cost for this Project base scope is between $425,000-$500,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range.
Contractors bidding the project are required to attend the mandatory pre-bid conference prior to bidding. The pre-bid conference is scheduled for April 15, 2025 at 2:00 P.M. and April 23, 2025 at 10:00 A.M., and will be located at the City Corporation Yard 5709 Scarlett Court, Dublin CA 94568. Bids will not be accepted from contractors that do not attend one of the pre-bid meetings. Sub-contractors are not required to attend the pre-bid conference.